Baha Mar Pier
MARINE AND EARTHWORKS —
BMC was contracted to build the pier which included the construction of wood docks, floating docks, raising the crest of the existing breakwater and the installation of MEP systems for the pier.
Contract Value $2.3M
Perfect Day at CocoCay Pier
MARINE AND EARTHWORKS —
BMC was contracted to rehabilitate the existing beach at Royal Caribbean International’s, formerly Royal Caribbean Cruise Line, private island destination Perfect Day at CocoCay. Works involved installation of 35,000 cuyd of imported beach sand, grading, installation of groin structures to hold the beach in place. In an effort for the island to retain full functionality as a port of call during replenishment, work was conducted at night to limit interference of RCI’s operations.
Contract Value $2.8M
Goldwynn Piling
INDUSTRIAL —
BMC was contracted to provide structural support for the Goldwynn project, an 8-storey mixed used waterfront building featuring the Hotel at Goldywynn and the Residences at Goldwynn. Works involved the installation of 680no. 24” diameter, 30’+ auger cast compression and tension piles.
Contract Value $2.7M
Harbour Island Marina
MARINE AND EARTHWORKS —
BMC was contracted to carry out the following scope of works for the construction of the Harbour Island Marina:
Contract Value $12M
Hurricane Hole Marina
MARINE AND EARTHWORKS —
BMC was contracted for sea and land based dredging and the demolition of existing structures in order to construct a new marina including breakwaters, fixed and floating docks, accessories and MEP systems.
Contract Value $12.3M
Norman's Cay Marina
MARINE AND EARTHWORKS —
BMC was contracted for the construction of Norman's Cay Marina. Scope included heavy earthworks, dredging, grading works, construction and installation of docks (8,250 sq. ft. of Timber Docks, 10,300 sq. ft. of floating concrete docks), flushing channel breakwaters and main channel breakwater, boulder works (25,000 tons of breakwater boulders and 3,318 tons of shoreline protection revetment), RORO ramp, construction of wooden bridges and electrical and utilities installation.
Contract Value $7.5M
Ocean Cay Breakwater Project
HEAVY CIVIL —
BMC was contracted to carry out the construction of a combi-wall/ retaining wall structure with steel and sheet piles and the construction of north and south breakwaters to protect the Ocean Cay coast.
Contract Value $9M
The Pointe Marina
MARINE AND EARTHWORKS —
BMC was contracted to construct the marina at the new resort on West Bay St. Works included:
Contract Value $7M